Two white colonial houses with lit windows and black shutters photographed at dusk along a tree-lined residential street.

AC Installation in Hempstead, NY

Tell us about the job

Takes about a minute. No obligation.

New system or replacementCentral ACNassau County, NY
Step 1 of 2

What ZIP code is the job in?

Electricity in Nassau County ran 25.49 cents per kilowatt-hour in 2025, among the highest rates in the country. An air conditioner here is going to run hard too. The dew point averages 65°F across June, July and August, and that's the number that makes the air feel heavy, not just the temperature. A system has to work through that every day it runs. When power costs this much per hour, the efficiency of the unit you install stops being a spec on paper and starts showing up on your bill every month.

4 months
June through September, your air conditioner is on duty
82°F
the average summer afternoon it cools against
10 hail events
in ten years, and hail bends the fins on outdoor coils
13.4 SEER2
the federal minimum any new unit must meet
Isometric line illustration of a cutaway single-story building showing interior rooms, ceiling ductwork and an air handler, connected by lines to an outdoor condenser unit beside the exterior wall.
Your air conditioner works hardest from July through August.

NOAA nClimDiv, 1991–2020 normals

Half the houses in Nassau County went up in 1955 or earlier.

Install a system in a house that old and it has to match the house, not just the room size.

May is the month to get this done

Cooling runs June through September
Climate zone 4A
Power here costs 25.49 cents per kilowatt-hour

Nassau County sits in climate zone 4A, a mixed zone that asks real work of both your furnace and your AC. Any split system installed here has to meet the federal minimum efficiency, 13.4 SEER2, if it's under 45,000 Btu an hour and built since the start of 2023. That rule narrows what a contractor can legally put in your house. It also sets a floor, not a ceiling. Given what power costs here, a system that only meets the minimum will cost more to run than one built a step above it, every summer it's in the ground.

The system you choose now is what you'll pay to run all summer

Power here costs more than in most places, and this system will run on it every summer it's installed for. The unit built a step above the minimum costs less to run than the one that just clears it. Both will face the same heat and the same muggy air. Choosing the more efficient one now is the only point where that decision gets made.

Find a contractor
An outdoor air conditioning condenser unit mounted on a concrete pad surrounded by gravel, photographed against a partly cloudy blue sky.

The number on the label is what you'll live with every summer after

That SEER2 number on the label is a ratio, not a fixed output. It compares the cooling a system delivers over a season to the electricity it draws to do it. A higher number means the system is pulling more cooling out of every unit of power it uses, not that it cools faster or colder. Two systems can cool the same house to the same temperature and still draw very different amounts of power to get there. That gap doesn't show up on the install day. It shows up on the meter, every month the system runs, for as long as it's in the ground. A compressor that holds its efficiency over time depends on things beyond the rating too, like a properly sized system, a clean coil, and refrigerant charged to spec. But the rating on the label is the ceiling. Nothing done after install raises a system above it, only lets it fall short of it.

Sizing comes from a room by room load calculation

A contractor works out the cooling load by going through the house itself: the square footage of each room, how many windows face which direction, how much insulation is in the attic, how many people and appliances add heat to the space. That calculation is what tells a contractor the tonnage to install, not a guess based on the size of the old unit or a flat rule about square footage per ton.

The wrong size fails in two different ways

A system too big for the house cools the air fast and shuts off before it pulls the humidity out, so the house feels cold and damp at the same time. A system too small runs constantly trying to reach the thermostat setting and never quite gets there. Neither mistake shows up on the spec sheet. Both show up in how the house actually feels once the system is running.

Aerial view of a gray central air conditioning condenser unit on a concrete pad next to a house with vinyl siding.

A higher-efficiency unit would save about $40 a year to run in Nassau County compared with a new unit at the federal minimum.

  • A higher-efficiency unit$310 a year
  • A new unit at the federal minimum, 13.4 SEER2$350 a year

Estimates for a typical Nassau County home, from EIA household energy data, New York fuel prices and NOAA climate normals. Your home will differ.

Install day starts with the old equipment coming out, the indoor coil, the outdoor condenser, and the line set running between them. A contractor will check the ductwork at this point too, since a new system only performs as well as the ducts feeding it, and a leak or a bad connection found now is far easier to fix than one found later. Setting the new condenser means leveling the pad it sits on, since a unit that tilts over time can strain the compressor. The line set gets connected, pressure tested for leaks, then evacuated to pull all moisture and air out before any refrigerant goes in. Refrigerant gets weighed in to the exact charge the manufacturer specifies, not just added until the pressure looks right. Once it's running, a contractor checks the temperature split between the air going in and the air coming out, confirms the thermostat is wired and communicating, and walks the house to make sure every room is actually getting air.